Tiefbau - Schmutzwasser,Regenwasser, Schächte, Dämmung The warmest day this year, the thermometer shows 17 ° C. There is brisk business all day on the site. Early on we went. The material for exterior insulation was delivered and the work on the sewage and rainwater went on. Furthermore, the drainage pipes were verlelegt, which were wrapped in felt. The basement construction company drilled more holes for the light boxes that are mounted werden.Schicht after the application of external insulation by layer, the trench was filled, which takes a long time, as each shovel of earth had to be transported by wheelbarrow. This saves the gym :-).
in sealing, insulation and bays are the work progressed
the material stored in the garage