Tomorrow route released
So, now is also the last part of the castle restored forest railway completed. From tomorrow, the red rail car ride back the way from Marburg to Frankenberg and vice versa. Even in time for the start of school after the summer holidays, the traffic between weather and Marburg had been resumed.
The passenger is now presented an updated side connector, which has no telephone line, form signals and signal boxes. The electronic interlocking system, through which the train operation is controlled, is located in Peace Village.
bad, you'd think that by the complete renovation a piece of railway romance is lost. Dispatcher, the train stations in the course and served signals, there is no longer here. But the passengers expected
a barrier of poor access to the platform at stations.
can also, most residents of Simtshausen, birch forest and castle Bringhausen enjoy a shorter path to the breakpoint. There, the stations were moved toward the densely populated areas.
Photos to follow.
0 comments:
Post a Comment