Heute wurden die Arbeiten der Sanitärinstallation und der Belüftungsanlage fertiggestellt. Die Fa. Dahotherm leistete wieder gute Arbeit. Stets bedacht, die Wünsche des Kunden zu erfüllen. Die Trockenbauer have failed in the last week of the work. Maybe it was because that was too much cladding, which was put up again this week. Thus only could the plumbing work is carried out. The work of assembling troops from Hepp has always done a very good job and has needed almost the entire cladding 400h. Thank you from the Beplankungsteam Hepp
the ventilation channels
installation in the kitchen
installation in the bathroom
exhaust pipe for the gas heating
vent for the toilet
installation in the second bath